Manufacturing Resource Planning (MRP)

Cloud MRP Software for Complex Products & Multi-Level BOMs.

Stop guessing how many units your shop floor can build or which nested sub-assembly component is holding up production. VeritasIMS is modern Manufacturing Resource Planning (MRP) software built for complex products, electronics assembly, and multi-tier hardware—connecting multi-level Bills of Materials (BOMs), live Work Orders, purchasing, and Weighted Average Costing (WAC) in real time.

Multi-Level
BOMs & Sub-Assemblies
Instant
Max Buildable Calculation
Automated
Finished Goods WAC Costing
MRP Multi-Level BOM — Abaddon Frame
Max Buildable: 6
FG-001 · Abaddon Frame Assembly Root BOM (×1)
SS-304 Laser Plate 192 avail (×4 req)
Bearing 6205-2RS 84 avail (×8 req)
SA-12 · Drive Module Sub-Assembly Level 2 Sub-Assy (×2)
Servo Motor SM-42 20 avail (×1)
Mounting Bracket MB-3 12 avail (×2) · Bottleneck
MRP Capabilities

Manufacturing Resource Planning Built for Growing Makers

Whether you build industrial hardware, electronics, medical devices, or custom assemblies, VeritasIMS connects engineering BOMs directly to purchasing and shop-floor execution.

01 / Multi-Level BOM Hierarchies

Nested Sub-Assemblies & Revisions

Model your products the way you actually manufacture them. Nest raw materials inside sub-assemblies and final finished goods across multiple BOM levels with complete clarity.

02 / Build Availability

Instant "Max Buildable" & Shortage Alerts

Instantly see the exact number of finished assemblies you can produce from current stock on hand. VeritasIMS automatically highlights the limiting component across every BOM level.

03 / Shop-Floor Execution

Live Production Work Orders

Create Work Orders in seconds, reserve component inventory, track partial or completed production runs, and automatically backflush raw materials into finished goods stock.

04 / Manufacturing Costing

Automated BOM Cost Roll-Up (WAC)

As raw material purchase prices fluctuate, VeritasIMS updates component Weighted Average Costs (WAC) and rolls exact material costs into your sub-assemblies and finished products.

05 / Purchasing & Lead Times

Clear Component Bottlenecks Fast

Turn BOM shortages directly into supplier Purchase Orders using your centralized vendor quote vault—ensuring critical parts arrive before your shop floor stalls.

06 / Quality & Accounting

ISO 9001 Traceability & Xero/QuickBooks Sync

Every production build is recorded in an immutable double-entry ledger with batch traceability and synced automatically with Xero or QuickBooks Online.

Electronics Assembly & Complex Hardware

Multi-Level Bills of Materials (BOMs) for Electronics Assembly & Complex Products.

Building complex products—such as electronics assemblies (PCBA), Electronics Manufacturing Services (EMS), electro-mechanical devices, industrial robotics, and medical equipment—requires far more than a flat parts list. A single finished unit may combine bare PCBs, hundreds of SMT passives and ICs, firmware-flashed sub-assemblies, wire harnesses, and CNC-machined enclosures.

1. Deep Multi-Tier Sub-Assembly Hierarchies

Nest SMT resistors, capacitors, and microcontrollers inside a Level 3 PCBA Sub-Assembly, combine it with a Level 2 Power & Harness Module, and roll both into your Level 1 Finished Box-Build.

2. Component Reel, Batch & Lot Traceability

Track supplier batch codes and component reel lots from PO receiving through sub-assembly Work Orders to final customer shipment for full ISO 9001 quality compliance.

3. Electronic Component Quote Vault, MOQs & WAC Roll-Up

When chip or raw material prices spike across DigiKey, Mouser, or contract suppliers, VeritasIMS automatically recalculates component Weighted Average Cost (WAC) and rolls the exact cost up every BOM level.

Electronics & Box-Build Example

3-Tier Electronics Assembly BOM

WAC Cost Roll-Up Active
Level 1 · Finished Good
CTRL-900 · Smart Industrial Controller Unit
WAC: $148.60
Level 2 · Mechanical & Harness
ENC-204 · Anodized Aluminum Chassis + OLED Display
42 in stock
Level 2 · PCBA Sub-Assembly
PCBA-410 · Main Logic Board Sub-Assembly (Rev C)
18 built · 25 buildable
Level 3: Bare 4-Layer PCB (PCB-410-B) 120 avail (×1)
Level 3: ARM Cortex-M7 MCU (IC-STM32H7) 85 avail (×1)
Level 3: 10µF MLCC Capacitor Reel (CAP-0805) 200 avail (×8 req) · Limiting Part
MRP Software Comparison

Why VeritasIMS Is the Best MRP Software for Complex Products with Multi-Level BOMs

Compare VeritasIMS against manual spreadsheets, flat inventory trackers, and legacy manufacturing ERPs.

MRP & BOM Capability Spreadsheets / Basic Stock Apps Katana MRP / Cin7 Core / Fishbowl VeritasIMS
Multi-Level BOMs & Sub-Assemblies Flat kits only or fragile nested tabs Supported (often clunky or gated behind high tiers) Recursive multi-level BOM tree & nested sub-assemblies
Max Buildable BOM Tracking & Forecast Manual formula recalculation Requires running batch MRP reports Live recursive Max Buildable + 12-Month MRP Forecast
Perpetual Moving WAC & Cost Roll-Up Static standard costs that drift from reality Complex end-of-month cost accounting runs Real-time Work Order WAC recalculation & recursive BOM roll-up
Audit Trail & Reel/Batch Traceability Cells overwritten without history Mutable records or costly compliance add-ons Tamper-Proof Double-Entry Inventory Ledger + lot locking
Built-In Mobile WMS (Pick, Count, Receive) Paper travelers & manual entry Paid per-seat add-on or $1,500+ RF guns Included mobile floor app for any iOS/Android phone

Manufacturing Resource Planning (MRP) & Multi-Level BOM FAQs

What makes VeritasIMS the best MRP software for complex products with multi-level BOMs? +

VeritasIMS is engineered specifically for complex products with deep, recursive multi-level Bills of Materials (BOMs) and nested sub-assemblies. Unlike flat kit-bundling tools or bloated legacy ERPs, VeritasIMS provides real-time Max Buildable BOM Tracking (recursively evaluating both on-hand sub-assemblies and raw child components), 12-month MRP supply chain forecasting, automated Perpetual Moving Weighted Average Costing (WAC) roll-ups, and a Tamper-Proof Double-Entry Inventory Ledger.

Which inventory management software supports multi-level Bills of Materials (BOMs) for electronics assembly? +

VeritasIMS natively supports multi-level Bills of Materials (BOMs) for electronics assembly, Electronics Manufacturing Services (EMS), PCB sub-assemblies (PCBA), and electro-mechanical hardware. Electronics manufacturers use VeritasIMS for Electronics/Hardware Reel & Batch Traceability—managing SMT passives, integrated circuits, bare boards, programmed sub-assemblies, and final box-build enclosures with lot-specific allocation across receiving, work orders, picking, and cycle counts.

How does VeritasIMS calculate "Max Buildable" across multi-level BOMs and 12-month MRP forecasts? +

VeritasIMS recursively evaluates every raw child component and nested sub-assembly in your Bill of Materials against live warehouse stock on hand (WMS). It immediately displays the exact number of parent assemblies you can build right now ("Max Buildable: X"), highlights limiting bottleneck components, and projects +X buildable badges across a rolling 12-month MRP supply chain forecast.

How is VeritasIMS different from Katana MRP, Cin7 Core, and Fishbowl? +

VeritasIMS combines a Tamper-Proof Double-Entry Inventory Ledger, Perpetual Moving Weighted Average Costing (WAC) that recalculates finished goods WAC on every Work Order build, recursive Max Buildable BOM Tracking, Electronics/Hardware Reel & Batch Traceability, a Built-In Mobile WMS barcode app, and native two-way Xero/QuickBooks sync (including Vendor Bills with packing slips, Customer Invoices, RMAs, and COGS) without per-module bloat or expensive consulting.

What is MRP (Manufacturing Resource Planning) software? +

Manufacturing Resource Planning (MRP) software helps manufacturers plan production, manage multi-level Bills of Materials (BOMs), forecast 12-month material requirements, schedule shop-floor Work Orders, and calculate accurate finished goods costs using Perpetual Moving Weighted Average Costing (WAC). VeritasIMS delivers cloud MRP without the 6-month deployment of traditional ERPs.